No caption
IMG_0617.JPG
Details
Thursday, October 2, 2025 · 8:44 AM
39.39698, -120.02007· 1691m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/407sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (44 fields)
ApertureValue1.6638
BrightnessValue6.3637
ColorSpace65535
CompositeImageGeneral Composite Image
DigitalZoomRatio1.0014
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:02
GPSDestBearing32.7203
GPSDestBearingRefTrue North
GPSHPositioningError39.1388
GPSImgDirection32.7203
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp15:44:28
HostComputeriPhone 16 Pro
latitude39.3970
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0201
MeteringModePattern
ModifyDate2025-10-02T08:44:29.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.6706
Software26.0
SubjectArea{"0":2841,"1":2134,"2":3146,"3":1883}
SubSecTimeDigitized489
SubSecTimeOriginal489
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an excavated pit with vertical and horizontal pipes installed within. The walls of the excavation are earthen with some visible layering. Two pipes protrude, suggesting early stages of underground infrastructure installation. There are no workers visible, and the setup appears to be in a preparatory phase for further construction activity.
excavation
soil with gravel bottom overcast conditions visible excavation accessible from top
Safety barrier is visible at one edge, but no other safety features are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
swppp erosion control
erosion-controlwattle-installation
backhoe-loader
2m
trenching
trenchingexcavation-work
excavator
3m
trenching
trenchingshoveling
shovel
3m
trenching
trenchingtrench-inspection
soil
3m
trenching
trenchinginspection
shovel
3m
excavation
excavationsoil
soil
4m
trenching
trenchingsafety cones
4m
trenching
trenchingground-excavation
excavator
4m
trenching
trenchingexcavation
shovel
4m
trenching
trenchingexcavation
excavator