No caption
IMG_0999.JPG
Details
Friday, October 17, 2025 · 12:58 PM
39.39143, -120.02125· 1680m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/3891sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue10.1303
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:17
GPSDestBearing0.9305
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection0.9305
GPSImgDirectionRefT
GPSSpeed0.3552
GPSSpeedRefK
GPSTimeStamp19:58:59
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-10-17T12:58:59.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.9259
Software26.0.1
SubjectArea{"0":2002,"1":1511,"2":2218,"3":1328}
SubSecTimeDigitized677
SubSecTimeOriginal677
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench with large blue pipes laid out for installation. The pipes are connected with various joints wrapped in black and white tape. A blue bucket is visible near the pipes, and the trench is surrounded by dirt mounds. The setting appears outdoors with a view of a hillside in the background.
pipeline-installation
dirt trench with soil mounds sunny and bright open trench access
No specific safety controls or equipment are visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
valve vault
valve-installationtrench-work
excavator
1m
valve vault
pipe-installationvalve-vault-work
soil
1m
rebar formwork
timber-support-assemblyfoundation-preparation
hand-tools
1m
trenching
trenchingpipe-installation
construction-truck
1m
pipeline installation
pipeline-connectionpipe-installation
protective-wrap
1m
pipeline installation
pipeline-installationvalve-installation
shovel
1m
trenching
trenchingcompaction
shovel
1m
concrete work
foundation-constructionexcavation
excavator
1m
trenching
trenchingexcavation
bucket of machinery
1m
pipeline installation
pipe-installationtrenching-work
shovel