No caption
IMG_0969.JPG
Details
Thursday, October 16, 2025 · 3:12 PM
39.39295, -120.02199· 1697m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/4673sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.7218
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:16
GPSDestBearing113.2891
GPSDestBearingRefTrue North
GPSHPositioningError274.9341
GPSImgDirection113.2891
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp22:12:32
HostComputeriPhone 16 Pro
latitude39.3929
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0220
MeteringModePattern
ModifyDate2025-10-16T15:12:35.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.1901
Software26.0.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized864
SubSecTimeOriginal864
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a construction setup with a partially covered trench leading to a concrete valve vault located near a large finished water tank. Turquoise pipes are connected with valves and enter the vault. The setup suggests ongoing work around the valve vault installation or pipeline connection.
valve-vault
soil with open trench sunny with clear visibility adequate space around trench, no congestion
Safety features are not visible in frame.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
12m
trenching
trenchinginspection
soil
12m
trenching
trenchingearthwork
tracked skid steer loader
19m
trenching
trenchingpipe-installation
piping
19m
trenching
trenchingexcavation
21m
pipeline installation
pipe-layingtrench-work
hand tools
22m
trenching
trenchingexcavation
cars
22m
pipeline installation
pipe-installationtrench-work
excavator
23m
trenching
trenchingpipe-laying
excavator
24m
excavation
excavationground-preparation
excavator
25m
other
road-surveypaved-road
parked-vehicle