No caption
IMG_0889.JPG
Details
Monday, October 13, 2025 · 11:34 AM
39.39698, -120.02051· 1698m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1139sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.8221
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:10:13
GPSDestBearing10.6925
GPSDestBearingRefTrue North
GPSHPositioningError172.1168
GPSImgDirection10.6925
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp18:34:19
HostComputeriPhone 16 Pro
latitude39.3970
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0205
MeteringModePattern
ModifyDate2025-10-13T11:34:22.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue10.1535
Software26.0.1
SubjectArea{"0":2853,"1":2140,"2":3142,"3":1881}
SubSecTimeDigitized589
SubSecTimeOriginal589
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a backhoe loader depositing soil into an open trench. A person nearby is utilizing a manual tool, possibly for measurement or compaction. There is gravel visible on one side of a concrete structure, possibly a valve vault or another utility box. The setting appears to be an outdoor area with visible trees and uneven terrain.
backfill
soil, gravel, uneven ground overcast lighting open access with some equipment and materials staged near trench
PPE like hard hats and work boots are visible, but no specific safety controls are noticed.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
17m
swppp erosion control
erosion-control-setupswppp-compliance
gravel
20m
other
access-road-maintenancetelecommunications-setup
construction-vehicle
23m
inspection documentation
inspectionsite-inspection
tank
23m
other
access-roadsite-access
telecommunications-pole
26m
other
preconstruction-setuptank
service-truck
28m
excavation
utility-vault-installationexcavation
shovel
28m
excavation
vault-installationpipe-installation
shovel
28m
electrical
electrical-installationelectrical-panel
soil
29m
other
access-road-inspectionutility-access
steel-access-cover
30m
electrical
electrical-installationcable-routing
conduits