No caption
IMG_0675.JPG
Details
Friday, October 3, 2025 · 9:32 AM
39.39145, -120.02119· 1679m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/554sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.0910
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:03
GPSDestBearing204.4163
GPSDestBearingRefTrue North
GPSHPositioningError4.0980
GPSImgDirection204.4163
GPSImgDirectionRefT
GPSSpeed0.3933
GPSSpeedRefK
GPSTimeStamp16:32:14
HostComputeriPhone 16 Pro
latitude39.3914
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-10-03T09:32:15.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.1138
Software26.0.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized286
SubSecTimeOriginal286
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a trench being dug, with a worker standing at its edge and a front-end loader nearby moving soil. A compactor is present in the trench, and construction equipment appears active. The terrain is uneven, hinting at ongoing excavation or trenching operations.
trenching
soil and open trench clear weather with good lighting spacious outdoor area with ample access
PPE is visible, including hard-hat, hi-vis vest, and work boots, but no additional safety controls are apparent.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
0m
trenching
trenchingpipe-installation
excavator
0m
pipeline installation
pipe-installationexcavation
shovel
1m
survey layout
surveyingsite-layout
Trimble Siteworks
1m
survey layout
surveyingsite-layout
trimble-device
1m
backfill
backfillingtrench-backfill
excavator
1m
concrete work
foundation-preparationpipe-installation
excavator
1m
site grading
soil-transportgrading
excavator
2m
site grading
foundation-preparationcompaction
excavator
2m
site grading
gradingsite-preparation
excavator
2m
concrete work
formwork-constructionfoundation-work
excavator