No caption
IMG_7784.JPG
Details
Wednesday, May 14, 2025 · 3:27 PM
39.39205, -120.02240· 1639m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/1013sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue7.9101
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat48
GPSDateStamp2025:05:14
GPSDestBearing135.6122
GPSDestBearingRefTrue North
GPSHPositioningError17.2831
GPSImgDirection135.6122
GPSImgDirectionRefT
GPSSpeed0.5784
GPSSpeedRefK
GPSTimeStamp22:27:26
HostComputeriPhone 16 Pro
latitude39.3921
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0224
MeteringModePattern
ModifyDate2025-05-14T15:27:27.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.9847
Software18.5
SubjectArea{"0":2011,"1":1508,"2":1106,"3":665}
SubSecTimeDigitized487
SubSecTimeOriginal487
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image prominently features a mound of large rocks situated on uneven ground. There is loose soil and some smaller rocks scattered around. Vegetation, including green shrubs, can be seen growing nearby. It looks like an area between landscaping and rocky terrain. No construction equipment or personnel are visible.
site-grading
rocks and soil on uneven ground overcast or partially cloudy open area with natural terrain
No safety features are visible in frame.
Analyzed Apr 21, 2026
Nearby Photos
2m
site grading
soil-compactionearthwork
compactor
3m
trenching
trenchingsite-preparation
shovel
3m
trenching
trenchingconduit-preparation
3m
site grading
site-accessgrading
4m
trenching
trenchingpipe-laying
blue pipes
5m
pipeline installation
pipeline-installationpipes
pipes
5m
trenching
trenchingground-excavation
5m
excavation
excavationearth-moving
tracked excavator
5m
pipeline installation
pipe-installationtrenching
backhoe
6m
trenching
trenchingutility-preparation
bulldozer or similar