No caption
IMG_9833.JPG
Details
Friday, August 29, 2025 · 9:06 AM
39.39476, -120.02088· 1662m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/219sISO 125
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue4.6393
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:08:29
GPSDestBearing280.9749
GPSDestBearingRefTrue North
GPSHPositioningError12.8866
GPSImgDirection280.9749
GPSImgDirectionRefT
GPSSpeed1.2538
GPSSpeedRefK
GPSTimeStamp16:6:0
HostComputeriPhone 16 Pro
latitude39.3948
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0209
MeteringModePattern
ModifyDate2025-08-29T09:06:02.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue7.7752
Software18.6.1
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized012
SubSecTimeOriginal012
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows an open trench with a pipe running horizontally through it. The trench walls consist of compacted soil and asphalt at the surface. Hand tools and heavy machinery are visible near the trench. Excavation appears ongoing with a focus on pipeline installation.
trenching
open trench, compacted soil, asphalt surface outdoor daylight moderate access with visible machinery and tools
Safety features are not prominently visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
trenching
trenchingpipe-installation
excavator
1m
excavation
indoor-excavationtrenching
excavator
1m
pipeline installation
pipe-installationtrench-work
sandy soil
2m
trenching
trenchingexcavator
excavator
2m
site grading
earth-movingrock-relocation
loader
2m
other
material-handlingboulder
skid steer
2m
trenching
trenchingpipe-installation
excavator
3m
trenching
trenchingexcavator-operation
excavator
3m
trenching
trenchingexcavation
excavators
3m
survey layout
waterline-realignmentsewer-line-survey