No caption
IMG_9429.JPG
Details
Thursday, August 14, 2025 · 10:29 AM
39.39477, -120.02124· 1654m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 15.66mm f/2.8
15.659999847383mmf/2.81/318sISO 64
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.9709
BrightnessValue6.8798
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat120
GPSDateStamp2025:08:14
GPSDestBearing298.3047
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection298.3047
GPSImgDirectionRefT
GPSSpeed0.8424
GPSSpeedRefK
GPSTimeStamp17:29:39
HostComputeriPhone 16 Pro
latitude39.3948
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0212
MeteringModePattern
ModifyDate2025-08-14T10:29:39.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.3132
Software18.6
SubjectArea{"0":1999,"1":1521,"2":2204,"3":1333}
SubSecTimeDigitized573
SubSecTimeOriginal573
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image displays a set of PVC conduits laid parallel to each other on a dirt trench. Each conduit is secured in place using plastic spacers and zip ties. The conduits are labeled and are installed in a trench, suggesting ongoing electrical or communication line installation. The trench appears to be in the early stages before backfill.
pipeline-installation
dirt trench sunlit conditions open trench, accessible
Safety features are not visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
excavation
excavationtree-roots
1m
trenching
trenchingopen-trench
bulldozer
1m
trenching
trenchingexcavation
backhoe
1m
trenching
trenchinghydraulic-excavator
hydraulic excavator
1m
excavation
rock-removalexcavation-process
excavator
2m
excavation
pothole-measuringutility-locating
tape-measure
2m
trenching
trench-inspectiontrench
shovel
2m
trenching
trenchingutility-work
backhoe loader
2m
trenching
trenchingtrench
excavator
2m
trenching
trenchingconduit-installation
track-loader