No caption
IMG_8351.JPG
Details
Thursday, June 12, 2025 · 11:30 AM
39.39219, -120.02258· 1635m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/3425sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.3068
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:06:12
GPSDestBearing340.1546
GPSDestBearingRefTrue North
GPSHPositioningError4.0112
GPSImgDirection340.1546
GPSImgDirectionRefT
GPSSpeed1.1699
GPSSpeedRefK
GPSTimeStamp18:30:13
HostComputeriPhone 16 Pro
latitude39.3922
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0226
MeteringModePattern
ModifyDate2025-06-12T11:30:15.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue11.7417
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized088
SubSecTimeOriginal088
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a construction area undergoing site grading with clear tread patterns on the dirt surface. An excavator is centrally positioned, and various vehicles and materials such as barrels and equipment are visible along the right side. The terrain appears uneven with some piles of construction materials. Trees and a hill are in the background.
site-grading
compacted dirt with visible tread patterns clear and sunny vehicles and materials staged along the pathway
There are no visible safety controls or PPE in the frame.
Analyzed Apr 21, 2026
Nearby Photos
site grading
site-gradingearthmoving
compactor
1m
site grading
site-gradingcompaction
compactor
2m
site grading
earthworksite-grading
bulldozer
3m
trenching
trenchingexcavation-work
excavator
4m
trenching
trenchinghand-excavation
excavator
5m
pipeline installation
pipeline-installationtrenching
compactor
5m
site grading
site-gradingground-leveling
soil-compactor
5m
inspection documentation
soil-inspectionworker-activity
5m
pipeline installation
pipe-installationjoint-sealing
compaction-tool
5m
trenching
duct-bank-trenchingconduit-installation
excavator