IMG_8337.JPG

No caption

IMG_8337.JPG

Tags

Details

Wednesday, June 11, 2025 · 1:50 PM

39.39320, -120.02254· 1648m

Location Context

1 / 5

USGS Topo

No elevation data

FEMA Flood

No flood data

OSM Infra

No address data

USDA Soil

No soil data

USGS Hydro

No hydro data

Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/4975sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue9.9249
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:06:11
GPSDestBearing353.4753
GPSDestBearingRefTrue North
GPSHPositioningError71.0135
GPSImgDirection353.4753
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp20:50:4
HostComputeriPhone 16 Pro
latitude39.3932
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0225
MeteringModePattern
ModifyDate2025-06-11T13:50:06.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.2805
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized871
SubSecTimeOriginal871
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72

AI Analysis

The image shows a construction site with site grading and excavation activities. On the left side, an excavator is actively moving soil, while dirt piles are noticeable in the background. A dirt road runs through the right side of the image, and several structures or materials are visible near its edge. The surrounding area features a mountainous landscape with trees.

site-grading
dirt and gravel surface with an open area clear weather with daylight access appears open with some materials alongside the road
PPE is visible on workers, but other safety features are not visible in frame.

Equipment & Materials

Analyzed Apr 21, 2026