No caption
IMG_8327.JPG
Details
Wednesday, June 11, 2025 · 10:51 AM
39.39281, -120.02267· 1645m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/709sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue8.1945
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:06:11
GPSDestBearing127.0160
GPSDestBearingRefTrue North
GPSHPositioningError59.4813
GPSImgDirection127.0160
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp17:51:27
HostComputeriPhone 16 Pro
latitude39.3928
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0227
MeteringModePattern
ModifyDate2025-06-11T10:51:28.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.4701
Software18.5
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized179
SubSecTimeOriginal179
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a person wearing safety gear inspecting a section of ground that has been prepared with grid-like impressions, possibly for stabilization or planting. Caution tape is laid out along the center of this area. In the mid-ground, construction equipment is visible off to the side, and the site is surrounded by trees and hills with dense vegetation.
site-grading
soil with grid impressions clear weather with bright lighting open access with no visible congestion
PPE and caution tape are visible as safety measures.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
trenchingpipe-installation
excavation equipment
2m
trenching
trench-excavationpiping-installation
bulldozer
2m
trenching
trenchingexcavation
excavator
2m
site grading
road-compactionmud-management
roller-compactor
2m
site grading
compactionsite-grading
roller-compactor
2m
excavation
excavationexcavator
excavator
3m
excavation
excavationboulder-moving
excavator
3m
site grading
site-preparationgrading
front loader
3m
site grading
site-gradingrock-moving
excavator
3m
excavation
excavationland-clearing
excavator