No caption
IMG_8528.JPG
Details
Friday, June 27, 2025 · 11:46 AM
39.39329, -120.02278· 1649m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/5714sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue10.0154
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:06:27
GPSDestBearing11.2578
GPSDestBearingRefTrue North
GPSHPositioningError11.3247
GPSImgDirection11.2578
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp18:46:28
HostComputeriPhone 16 Pro
latitude39.3933
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0228
MeteringModePattern
ModifyDate2025-06-27T11:46:29.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue12.4804
Software18.5
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized953
SubSecTimeOriginal953
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
A worker is present in an open trench, where plastic conduits are installed. Trench boxes are visible, and traffic cones are placed around the site for safety. A utility vehicle is stationed nearby. The work area seems actively engaged in trenching, with conduit's pathway partially covered with soil.
trenching
soil with open trench sunny conditions unobstructed access on dirt road
PPE is worn by the worker and traffic cones are used for site safety. Open trench is a visible hazard.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
pipeline installation
pipeline-installationtrenching
loader
3m
trenching
conduit-installationtrenching
backhoe
5m
trenching
pipe-installationtrenching
blue-plastic-pipes
6m
trenching
trenchingexcavation-work
excavators
6m
excavation
excavationearth-moving
excavator
6m
excavation
excavationearthmoving
excavator
7m
trenching
trenchingpipeline-installation
utility-vehicle
7m
electrical
conduit-installationutility-box
conduit-pipes
8m
pipeline installation
pipe-joiningpipeline-laying
pipe
8m
site grading
road-gradingsurface-preparation
dirt