No caption
IMG_8479.JPG
Details
Wednesday, June 25, 2025 · 11:07 AM
39.39306, -120.02267· 1628m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/799sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue9.2806
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:06:25
GPSDestBearing358.3438
GPSDestBearingRefTrue North
GPSHPositioningError38.3105
GPSImgDirection358.3438
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp18:7:31
HostComputeriPhone 16 Pro
latitude39.3931
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0227
MeteringModePattern
ModifyDate2025-06-25T11:07:32.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue9.6415
Software18.5
SubjectArea{"0":2003,"1":1511,"2":2323,"3":1330}
SubSecTimeDigitized532
SubSecTimeOriginal532
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a deep trench along a dirt road with surrounding vegetation and trees. A utility truck is parked nearby with construction materials in its bed. A worker wearing PPE appears to be inspecting the trench. Metal pipes are staged on the ground near the trench, suggesting that pipeline installation might occur next.
trenching
dirt road with open trench clear day, bright sunlight open space with visible access for vehicles
Basic PPE and safety cones are visible near the trench.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
pipeline-worktrench-excavation
hand-tools
3m
pipeline installation
trenchingsoil-compaction
bulldozer
3m
trenching
trenchingexcavation
excavator
3m
trenching
trenchingconduit-installation
excavator
4m
trenching
trenchingexcavation
soil
6m
site grading
site-gradingearth-moving
excavator
6m
pipeline installation
pipeline-connectionvalve-installation
hand tools
6m
pipeline installation
pipeline-installationcomponent-connection
hand tools
6m
trenching
trenchingduct-bank-installation
excavator
6m
pipeline installation
fire-hydrant-installationpiping
gravel