No caption
IMG_0791.JPG
Details
Wednesday, October 8, 2025 · 3:13 PM
39.39147, -120.02135· 1678m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/286sISO 50
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue6.9950
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:10:08
GPSDestBearing302.4717
GPSDestBearingRefTrue North
GPSHPositioningError4.7487
GPSImgDirection302.4717
GPSImgDirectionRefT
GPSSpeed0.6973
GPSSpeedRefK
GPSTimeStamp22:13:10
HostComputeriPhone 16 Pro
latitude39.3915
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0213
MeteringModePattern
ModifyDate2025-10-08T15:13:11.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.1609
Software26.0.1
SubjectArea{"0":2002,"1":1508,"2":2218,"3":1328}
SubSecTimeDigitized138
SubSecTimeOriginal138
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows trenching work in progress with a compaction tool at the bottom of a partially excavated trench. The trench appears to be on a slope surrounded by natural vegetation. The soil around the trench is loose and unfinished. No other construction materials or machinery are visible in the immediate vicinity.
trenching
loose soil trench daylight with clear conditions no congestion or visible laydown areas
No safety controls or personal protective equipment are visible in frame.
Equipment & Materials
Analyzed Apr 21, 2026
Nearby Photos
0m
trenching
trenchingexcavation-activity
excavator
1m
trenching
trenchingsoil-excavation
soil
2m
pipeline installation
pipeline-installationpipes
soil
3m
trenching
trenchingpipe-installation
concrete-bags
3m
pipeline installation
pipeline-installationpipes
rocky soil
3m
trenching
trenchingpipe-installation
soil
3m
trenching
conduit-installationtrenching
soil
3m
pipeline installation
pipeline-installationtrenching
excavator
4m
backfill
trench-backfillingmaterial-spreading
shovel
4m
trenching
trenchingpipe-laying