No caption
IMG_9752.JPG
Details
Wednesday, August 27, 2025 · 9:25 AM
39.39467, -120.02110· 1644m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 2.22mm f/2.2
2.220000028611935mmf/2.21/99sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue2.2750
BrightnessValue5.2068
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight3024
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat14
GPSDateStamp2025:08:27
GPSDestBearing111.5378
GPSDestBearingRefTrue North
GPSHPositioningError22.6421
GPSImgDirection111.5378
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp16:25:37
HostComputeriPhone 16 Pro
latitude39.3947
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0211
MeteringModePattern
ModifyDate2025-08-27T09:25:40.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue6.6325
Software18.6.1
SubjectArea{"0":2000,"1":1511,"2":2217,"3":1330}
SubSecTimeDigitized283
SubSecTimeOriginal283
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
An open trench is shown with a worker in a high-visibility vest examining or working with a partially exposed pipeline. Heavy machinery is present near the trench, likely used for excavation. The area is an active construction site with disrupted soil and concrete surface near a building marked with a number above its door.
trenching
disturbed soil and concrete daylight conditions open access to trench; no visible congestion
Basic PPE is visible with caution cones near the trench but no barriers.
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
1m
trenching
utility-locatingdepth-measurement
tape-measure
1m
demolition
concrete-demolitionfloor-breaking
jackhammer
1m
trenching
trenchingsoil-leveling
tracked excavator
1m
trenching
trenchingexcavation
hydraulic excavator
1m
excavation
pothole-utility-locatingpavement
excavator
1m
excavation
utility-locatingpotholing
hand tool
2m
pipeline installation
pipeline-installationpipe-assembly
hand tool (uncertain type)
2m
trenching
trenchingconduit-installation
excavator
2m
trenching
trenchingexcavation
excavator
2m
other
gravel-levelingground-preparation
backhoe