No caption
IMG_9697.JPG
Details
Monday, August 25, 2025 · 2:10 PM
39.39449, -120.02151· 1652m
Location Context
1 / 5
USGS Topo
No elevation data
FEMA Flood
No flood data
OSM Infra
No address data
USDA Soil
No soil data
USGS Hydro
No hydro data
Apple iPhone 16 Pro
iPhone 16 Pro back triple camera 6.765mm f/1.78
6.764999865652793mmf/1.7799999713880651/507sISO 80
Flash did not fire, compulsory flash mode
Show all EXIF (43 fields)
ApertureValue1.6638
BrightnessValue6.6639
ColorSpace65535
CompositeImageGeneral Composite Image
ExifImageHeight4284
ExifVersion2.3.2
ExposureCompensation0
ExposureModeAuto
ExposureProgramNormal program
FlashpixVersion1.0
FocalLengthIn35mmFormat24
GPSDateStamp2025:08:25
GPSDestBearing205.2757
GPSDestBearingRefTrue North
GPSHPositioningError22.4143
GPSImgDirection205.2757
GPSImgDirectionRefT
GPSSpeed0
GPSSpeedRefK
GPSTimeStamp21:10:41
HostComputeriPhone 16 Pro
latitude39.3945
LensInfo2.2200, 15.6600, 1.7800, 2.8000
LensMakeApple
longitude-120.0215
MeteringModePattern
ModifyDate2025-08-25T14:10:43.000Z
OffsetTime-07:00
OffsetTimeDigitized-07:00
OffsetTimeOriginal-07:00
ResolutionUnitinches
SceneCaptureTypeStandard
SceneTypeDirectly photographed
SensingMethodOne-chip color area sensor
ShutterSpeedValue8.9861
Software18.6.1
SubjectArea{"0":2851,"1":2137,"2":3141,"3":1884}
SubSecTimeDigitized501
SubSecTimeOriginal501
WhiteBalanceAuto
XResolution72
YCbCrPositioning1
YResolution72
AI Analysis
The image shows a worker wearing a hard hat and hi-vis vest working inside a trench, installing or connecting a green pipe. The trench is surrounded by soil and pavement. A manhole is open next to the trench, and various tools are on the ground nearby.
pipeline-installation
soil and pavement overcast daylight open trench access
PPE including hard hat, hi-vis vest, and work boots are visible. Open trench and uneven ground present potential hazards.
Equipment & Materials
AI Tags
Analyzed Apr 21, 2026
Nearby Photos
4m
trenching
trenchingtrench
backhoe
5m
trenching
trench inspectiontrench work
hand tools
5m
concrete work
duct-bank-installationconcrete-duct-bank
drill
7m
pipeline installation
trenchingpipeline-installation
shovel
8m
pipeline installation
pipeline-installationtrenching
backhoe
9m
trenching
trenchingexcavation
excavator
10m
paving surface restoration
surface-preparationgrading
gravel
10m
trenching
trenchingpipe-laying
skid-steer
10m
other
pipe-exposureutility-preparation
pipe
11m
trenching
trenchingconduit-laying
excavator